Kingridge Sewer Line
Name of Project: Kingridge Sewer Line
Impacted Areas: Kingridge Drive
Expected to Commence: Construction will be completed in phases. The first phase was completed in January 2011. The second phase is anticipated to commence in Summer 2011.
Expected to Finish: Expected late 2013
Work Hours: To be determined. However, 8:00am – 5:00pm, Monday - Friday, is anticipated.
Short Description of Work: Rehabilitate sanitary sewer line in Kingridge Canyon. Construction includes stabilization of the pipe’s foundation within the Canyon.
Benefits of Work: Reduce chances of sanitary sewer overflows
Expected Impacts: Traffic disruption and noise during construction
General Contractor: Phase II contractor to be determined.
Kingridge Sanitary Sewer Line Improvements - Phase III - Initial Study/Mitigated Negative Declaration (22.5 MB - 207 pages)
:
Entire document (22.5 MB - 207 pages)
Pages 1-5 (3.95 MB)
Page 6 (8.0 MB)
Pages 7-100 (4.62 MB)
Pages 101-182 (3.37 MB)
Pages 183-207 (2.69 MB)
Project Manager:
Evan Albert, Associate Engineer
(650) 522-7319