Hacienda, 31st to Hillsdale, Pedestrian Street Safety
Andy at work (3)_Resized.JPGOverview:
The Department of Public Works is working with residents who live on and in the vicinity of Hacienda, 31st to Hillsdale, on possible ways to increase the sense of pedestrian street-safety on Hacienda. 

Latest News! (June 2013 Update)
The project team has been working with the neighborhood since June 2011. Over the past several months, we have done the necessary field work to start on the design of the project, and locate the needed project funding.

Updated Timeline
The Request for Quotes:  June 20, 2013
Award of Contract (if not award protests:  August 18, 2013
Construction: September to Holidays

Questions on Project?
If you have any follow up questions, please call Sheri at (650) 522-7334 or email her at .
Public Works Commission
April 10, 2013
At the April 10th meeting of the Public Works Commission (acting as the Bicycle and Pedestrian Advisory Committee), the project team gave a quarterly update which included the Hacienda Pedestrian Safety Improvement Project. This was another opportunity for neighbors to view the layout of this project. If you attended as a new participant of the public process, and have follow up questions, please contact Sheri at the number noted above.
Public Works Commission
February 8, 2012
Public Works discussed the Hacienda Pedestrian Safety Project and a preliminary plan for how to increase pedestrian safety on Hacienda, 31st to Louise Lane. The project team presented an overview of the community process and a draft preliminary concept that shows sidewalk on both sides of Hacienda developed through ongoing conversations with the neighborhood. The PWC approved the design development of this project. Thank you to the residents who attended the meeting to voice their support.

Administrative Report

Neighborhood Project Check-In
January 26, 2012
The Public Works project team met on-site with the homeowners who currently do not have sidewalk, and adjacent neighbors who do have sidewalk, to go over the strengths and trade-offs of this revised preliminary design. As a group, we visited each property. During this on-site project check-in, the team received very positive feedback.

Neighborhood Workshop #2
September 28, 2011Hacienda Workshop_Ken Grp

Workshop attendees reviewed more detailed drawings of the two sidewalk options identified by the small group discussions at the June 9th workshop. Based on the feedback of the participating neighbors at workshop #2, the City team will be further exploring how to provide sidewalks on both sides of Hacienda in a way that further minimizes tree impacts.

Agenda
Community Flyer
Small Group Notes

Neighborhood Workshop #1
Sergeant Greg Jacobson speaks to residents during workshopJune 9, 2011

City staff and residents on and near Hacienda, 31st to Hillsdale, reviewed possible solutions for improving the neighborhood’s sense of pedestrian street-safety.

Small Group Notes
Workshop Presentation
Community Flyer
Agenda 
Frequently Asked Questions

Sign Up for Email UpdatesSign Up for Future Updates 
Please share your contact information through Notify Me. By sharing your information, we can update you on future opportunities to stay engaged in the outreach effort. 


Questions?
Sheri Costa-Batis at (650) 522-7334 or .